School Name

Irene Reither
Elementary School

IMERIDIAN| Learning Ll

Date Test
Sampling Date Results Sampling and Testing Provider
Received

2/16/2024 3/22/2024 XXIDOH (for sampling and testing)
(lOther:

Ve

MERIDIAN SCHOOL DISTRICT



Testing Requirements

RCW 28A.210.410 and RCW 43.70.830 require all drinking water outlets in public schools built, or with all plumbing replaced, before 2016 be
tested for lead at least once between July 1, 2014, and June 30, 2026. Retesting shall occur at least once every five years thereafter. Drinking
water sampling and testing must be done in partnership with DOH or contracted through an accredited lab.

Action Plan Requirements

If test results reveal elevated lead levels above 5 parts per billion (ppb) at any outlet used for drinking or cooking, an action plan must be
developed. If your school has an existing action plan, you have the option of updating the existing plan to meet the following requirements
instead of creating a new one.

Per RCW 28A.210.410, a school’s action plan must meet the following requirements:

e The action plan shall be developed in consultation with DOH or your local health jurisdiction and in accordance with DOH’s technical
guidance.

e Consult with the Office of the Superintendent of Public Instruction (OSPI) when seeking funding for remediation activities. The OSPI Lead
in Water Remediation Grant is a potential source of funding.

e Before the action plan is officially adopted, it must be shared publicly with opportunity for public comment.

e For testing that occurred after July 25, 2021, the deadline for adopting the action plan is six months after receiving elevated lead test
results.

e  =The action plan must include:
1) Mitigation measures implemented since receiving elevated lead test results.

2) Aschedule of remediation activities that adhere to the technical guidance. The schedule may be based on the availability of state or
federal funding for remediation activities.

3) A plan for post-remediation sampling and testing to confirm remediation activities have reduced lead concentrations at drinking
water outlets to 5 or fewer ppb.

Irene Reither Elementary School
Action Plan: Lead in School Drinking Water | 2


Action Plan

Mitigation Measures

Mitigation measures are immediate (temporary or permanent) actions, such as shutting off an outlet or marking as “hand wash only,” to stop
access to drinking water with elevated lead concentrations. Outlets with lead concentrations exceeding 15 ppb must be shut off immediately
upon receiving test results in accordance with the technical guidance.

Irene Reither Elementary School has identified 21 drinking water outlets with elevated lead levels requiring mitigation. As per guidance from
Whatcom County Health Department, all fixtures with elevated results over 15ppb have been disabled and the appropriate signage displayed. All
fixtures with lead levels between 6ppb and 15ppb have had signage added that indicates the fixture is for hand washing only.

Mitigation measures have been implemented as follows:

Elementary
Ten-Mile Creek

Irene Reither Elementary School
Action Plan: Lead in School Drinking Water

305 — Tap only

signage
CL] permanent

temporary

Sample Sample | School Name Fixture Information Lead Mitigation Measure Date
Collection Building Name Test (Indicate temporary or permanent) | !mplemente
Date Result d
(ppb)
1) 2/16/2024 | 391370 | Irene Reither Sink - 3G Kitchenette Disabled water inlet and added 4/3/2024
Elementary signage
Ten-Mile Creek temporary CL] permanent
2) 2/16/2024 | 391366 | Irene Reither Fountain / Tap Combo in Removed tap handle and added 4/3/2024
Elementary hallway right of Rm 308 — signage
Ten-Mile Creek Tap only temporary CL] permanent
3) 2/16/2024 | 391368 | Irene Reither Fountain / Tap Combo in Rm Removed tap handle and added 4/3/2024
Elementary 309 — Tap only signage
Ten-Mile Creek temporary LJ permanent
4) 2/16/2024 | 390847 | Irene Reither Sink — Multi compartment 1 Disabled water inlet and added 4/3/2024
Elementary of 4 in kitchen signage
Ten-Mile Creek temporary CL] permanent
5) 2/16/2024 | 391363 | Irene Reither Fountain / Tap Combo in Rm Removed tap handle and added 4/3/2024



6) 2/16/2024 | 391369 | Irene Reither Fountain / Tap Combo in Rm | 14 Added signage 5/1/2024
Elementary 310 — Tap only temporary CL] permanent
Ten-Mile Creek
7) 2/16/2024 | 390851 | Irene Reither Kitchen sink sprayer 4 of 4 Added signage 5/1/2024
Elementary temporary CL] permanent
Ten-Mile Creek
8) 2/16/2024 | 390860 | Irene Reither Fountain / Tap Combo in Added signage 5/1/2024
Elementary hallway right of Rm 301 — temporary CI permanent
Ten-Mile Creek Tap only
9) 2/16/2024 | 391361 | Irene Reither Fountain / Tap Combo in Rm Added signage 5/1/2024
= Elementary 303 — Tap only temporary CL] permanent
Ten-Mile Creek
10) | 2/16/2024 | 390858 | Irene Reither Fountain / Tap Combo in Rm Added signage 5/1/2024
Elementary 301 — Tap only temporary CL] permanent
Ten-Mile Creek
11) | 2/16/2024 | 390862 | Irene Reither Fountain / Tap Combo in Rm Added signage 5/1/2024
Elementary 304 — Tap only temporary CL] permanent
Ten-Mile Creek
12) | 2/16/2024 | 390863 | Irene Reither Staff kitchenette right of Added signage 5/1/2024
Elementary reading room — Sink — Tap temporary CZ permanent
Ten-Mile Creek only
13) | 2/16/2024 | 391360 | Irene Reither Fountain / Tap Combo in Rm Added signage 5/1/2024
Elementary 302 — Tap only temporary CL] permanent
Ten-Mile Creek
14) | 2/16/2024 | 390849 | Irene Reither Sink — Multi compartment 2 Added signage 5/1/2024
— Elementary of 4 in kitchen temporary CI permanent
Ten-Mile Creek
15) | 2/16/2024 | 390850 | Irene Reither Sink — Multi compartment 3 | 7 Added signage 5/1/2024
Elementary of 4 in kitchen temporary CI permanent
Ten-Mile Creek
Irene Reither Elementary School
Action Plan: Lead in School Drinking Water | 4


16)

17)

2/16/2024

2/16/2024

390855

390867

lrene Reither
Elementary
Ten-Mile Creek
Irene Reither
Elementary
Ten-Mile Creek

Sink — Multi compartment —
Room 300

Fountain / Tap Combo in
hallway right of Rm 308 -
Fountain only

Added signage
temporary

Added signage
temporary

CL] permanent

CL] permanent

5/1/2024

5/1/2024

18)

19)

20)

2/16/2024

2/16/2024

2/16/2024

391364

391367

390896

lrene Reither
Elementary
Ten-Mile Creek
lrene Reither
Elementary
Ten-Mile Creek
Irene Reither
Elementary
Main Building

Fountain / Tap Combo in Rm
306 — Tap only

Fountain / Tap Combo in Rm
308 — Tap only

Fountain / Tap Combo in
hallway left of Rm 205 —
Fountain only

Added signage
temporary

Added signage
temporary

Added signage
temporary

CL] permanent

CL] permanent

CL] permanent

5/1/2024

5/1/2024

5/1/2024

21)

2/16/2024

391365

Irene Reither
Elementary
Ten-Mile Creek

Irene Reither Elementary School
Action Plan: Lead in School Drinking Water

Fountain / Tap Combo in Rm
307 — Tap only

Added signage
temporary

CL] permanent

5/1/2024



Remediation Schedule

Remediation activities are short-term or permanent control measures to reduce lead concentrations in drinking water to 5 ppb or less. Per RCW
28A.210.410, outlets that have elevated lead levels (above 5 ppb) must be identified, remediated (if not permanently mitigated), and retested.
Refer to the technical guidance for remediation options.

Irene Reither Elementary School has identified 21 drinking water outlets with elevated lead levels requiring remediation. (Outlets listed in the
previous table with temporary mitigation measures are repeated in the table below.) The school intends to permanently mitigate all fixtures
with elevated levels and is obtaining pricing to secure OSPI grant funding for replacement of the affected fixtures. The timing of fixture

replacement is subject to the availability of these funds but is anticipated to be completed no later than (NLT) 08/31/2024.

Remediation activities have been or will be implemented as follows:

Sample Sample
Collection | ID
Date

School Name
Building Name

Fixture Information

Remediation Activity

Planned or
Completed
Implementation
Date

1) 2/16/2024 | 391370 | Irene Reither Sink - 3G Kitchenette Replacement of fixture - Retest Planned NLT
Elementary 08/31/2024
Ten-Mile Creek
2) 2/16/2024 | 391366 | Irene Reither Fountain / Tap Combo in Replacement of fixture - Retest Planned NLT
Elementary hallway right of Rm 308 — 08/31/2024
Ten-Mile Creek Tap only
3) 2/16/2024 | 391368 | Irene Reither Fountain / Tap Combo in Replacement of fixture - Retest Planned NLT
Elementary Rm 309 — Tap only 08/31/2024
Ten-Mile Creek
4) 2/16/2024 | 390847 | Irene Reither Sink — Multi Replacement of fixture - Retest Planned NLT
Elementary compartment 1 of 4 in 08/31/2024
Ten-Mile Creek kitchen
5) 2/16/2024 | 391363 | Irene Reither Fountain / Tap Combo in Replacement of fixture - Retest Planned NLT
Elementary Rm 305 — Tap only 08/31/2024
Ten-Mile Creek
Irene Reither Elementary School
Action Plan: Lead in School Drinking Water | 6


6) 2/16/2024

2/16/2024

391369

390851

Irene Reither
Elementary
Ten-Mile Creek
Irene Reither
Elementary
Ten-Mile Creek

Fountain / Tap Combo in
Rm 310 — Tap only

Kitchen sink sprayer 4 of
4

14

Replacement of fixture - Retest

Replacement of fixture - Retest

Planned NLT
08/31/2024

Planned NLT
08/31/2024

2/16/2024

2/16/2024

2/16/2024

390860

391361

390858

lrene Reither
Elementary
Ten-Mile Creek
Irene Reither
Elementary
Ten-Mile Creek
Irene Reither
Elementary
Ten-Mile Creek

Fountain / Tap Combo in
hallway right of Rm 301 —
Tap only

Fountain / Tap Combo in
Rm 303 — Tap only

Fountain / Tap Combo in
Rm 301 — Tap only

Replacement of fixture - Retest

Replacement of fixture - Retest

Replacement of fixture - Retest

Planned NLT
08/31/2024

Planned NLT
08/31/2024

Planned NLT
08/31/2024

2/16/2024

2/16/2024

390862

390863

lrene Reither
Elementary
Ten-Mile Creek
lrene Reither
Elementary
Ten-Mile Creek

Fountain / Tap Combo in
Rm 304 — Tap only

Staff kitchenette right of
reading room — Sink —
Tap only

Replacement of fixture - Retest

Replacement of fixture - Retest

Planned NLT
08/31/2024

Planned NLT
08/31/2024

2/16/2024

2/16/2024

391360

390849

Irene Reither
Elementary
Ten-Mile Creek
lrene Reither
Elementary
Ten-Mile Creek

Fountain / Tap Combo in
Rm 302 — Tap only

Sink — Multi
compartment 2 of 4 in
kitchen

Replacement of fixture - Retest

Replacement of fixture - Retest

Planned NLT
08/31/2024

Planned NLT
08/31/2024

15) | 2/16/2024 | 390850 | Irene Reither Sink — Multi 7 Replacement of fixture - Retest Planned NLT
Elementary compartment 3 of 4 in 08/31/2024
Ten-Mile Creek kitchen
Irene Reither Elementary School
Action Plan: Lead in School Drinking Water | 7


16) | 2/16/2024

17) | 2/16/2024

390855

390867

Irene Reither
Elementary
Ten-Mile Creek
Irene Reither
Elementary
Ten-Mile Creek

Sink — Multi
compartment — Room
300

Fountain / Tap Combo in
hallway right of Rm 308 —
Fountain only

Replacement of fixture - Retest

Replacement of fixture - Retest

Planned NLT
08/31/2024

Planned NLT
08/31/2024

18) | 2/16/2024

19) | 2/16/2024

20) | 2/16/2024

391364

391367

390896

lrene Reither
Elementary
Ten-Mile Creek
Irene Reither
Elementary
Ten-Mile Creek
Irene Reither
Elementary
Main Building

Fountain / Tap Combo in
Rm 306 — Tap only

Fountain / Tap Combo in
Rm 308 — Tap only

Fountain / Tap Combo in
hallway left of Rm 205 —
Fountain only

Replacement of fixture - Retest

Replacement of fixture - Retest

Replacement of fixture - Retest

Planned NLT
08/31/2024

Planned NLT
08/31/2024

Planned NLT
08/31/2024

21) | 2/16/2024

391365

Irene Reither
Elementary
Ten-Mile Creek

Irene Reither Elementary School
Action Plan: Lead in School Drinking Water

Fountain / Tap Combo in
Rm 307 — Tap only

Replacement of fixture - Retest

Planned NLT
08/31/2024



Post-Remediation Testing

School Name Completed Post-Remediation Testing Planned Post-Remediation Testing
Isis SMS [Enter # of outlets here] outlets have 21 outlets will be sampled and
Elementary

been sampled and retested by: retested by:
School
DOH x] DOH
a contractor a contractor
Sampling date: [Click here to enter LC) TBD
date] Sampling is scheduled for: Fall 2024

Communication Plan

Meridian School District will communicate information about the plan for remedial action to reduce lead concentrations in drinking water
through our website at www.meridian.wednet.edu in the spring of each year. This information will be communicated annually until post-
remediation retesting does not detect an elevated lead level (above 5 ppb) at any drinking water outlet.

Contact Information

The following person(s) is the main point of contact for more information related to this action plan.
Name: Jay Yeager

Role: Director of Maintenance and Operations

Email: jyeager@meridian.wednet.edu

Phone: 360.318.2156

Preferred contact method: XlEmail LJPhone

Irene Reither Elementary School
Action Plan: Lead in School Drinking Water | 9