MERIDIAN
SCHOOL
DISTRICT

leaning larkves here

2024
Maintenance and Facilities Summer
Projects Review

September 25", 2024



&

A's

Irene Reither
Elementary

4 full time custodians are assigned to IRE (1
Lead & 3 evening)

100,245 Sq Ft, 43 classrooms plus auxiliary
spaces cleaned, and minor maintenance
performed by custodial team

No classroom moves!!!

John Picht (Lead Custodian) retired after 26
years of service with Meridian

Maintenance spent three full weeks at IRE
performing various repair and preventative
maintenance work orders inside of the
buildings

Utilizing an OSPI grant, maintenance
replaced and conditioned 19 water fixtures
and supply lines in building B including the
kitchen that tested high for lead

138 air filters changed annually


IRE Office Water Leak Repair

> Water damage was discovered in two offices

A moisture investigation was performed by
Geotest, and it was determined that improper
construction procedures were the cause

> Tiger Construction was contacted and agreed with
the findings of the Geotest investigation

> Tiger offered to make the required repairs at no
cost to the district, even though the warranty
period has lapsed

AREA WITH
EXTENE VE

SS anal > Extensive repairs were required and included:

> Removing and replacing all of the CMU on
the exterior face

> Replacing the sheeting and waterproofing
membrane

> Removing windows and properly sealing
> Replacing interior wall board and wallpaper

Much appreciation to Scott Isenhart and all of the Tiger
Construction team for their response!!!


Meridian Middle
School

\
2.5 full time custodians are assigned to MMS (1 \ =
Lead & 1.5 evening)

81,958 Sq Ft, 27 classrooms plus auxiliary spaces ‘a | _
cleaned, and minor building maintenance was , Tire \
performed by the custodial team | eee Wipes

to maintain the campus at a standard that is
consistent with district wide practices,
regardless of the age of buildings

MMS custodial team takes great pride and care - =pl'-= \

en

Custodial team performed painting tasks in the
main hallway and exterior ramps

New backboards were installed on the
basketball court

|

i!
Wh
MW

HVAC and exhaust fans were added to spaces
that have shifted their intended use and have
become offices

Maintenance performed over 35 plumbing Pr =
repairs =

91 air filters changed annually



Meridian High
School

> 3 full time custodians are assigned to MHS
(1 Lead & 2 evening)

> 141,626 Sq Ft, 26 classrooms plus auxiliary
spaces cleaned, and minor building
maintenance performed by custodial team

> Custodial team attended a regional training on
June 25" in Everett

> Collaboration with peers
> Product demonstrations
> Breakout sessions
Continued lighting repairs and upgrades to LED

Campus courtyard and front lawn irrigation was
repaired and modified. Fully working for the
first time!

> 221 air filters changed annually



MHS Septic Drain
Field

> Received a violation letter from DOH in October 2023 for
standing effluent in the drain field

> A months long investigation and plan of action was put
into place in partnership with DOH and our civil engineer

> It was determined that the drain field needed to
be excavated and have the plumbing and fill
material replaced

> In April 2024 the district was awarded a $550,000
Emergency Repair Grant through OSPI for engineering and
construction

> Iverson Earthworks was awarded the project and began
work in July

> 7,200 cubic yards of material was excavated

> 6,060 lineal feet of pipe was removed and
replaced

> The project received final inspection by DOH on August
7h and was completed on August 26%

No local dollars were expended on the emergency repair



MHS Athletic
Fields

The practice football field was relocated to the
open field near the FFA barn

> Meridian Boosters club purchased an
irrigation reel and storage containers

Meridian Equipment provided a vibrating
roller

Maintenance staff, Athletic Director and
coaches all came together to operate the
roller

The septic drain field area has been seeded and
will become the new practice soccer field

> Football practice has been permanently
moved to reduce the high impact on the
drain field

The field will be available for full use
during the spring ‘25 athletic season

The district’s maintenance staff worked all
summer to maintain the Varsity Athletic “lawn”

> The team donated three hours each
Saturday and Sunday throughout the
summer to irrigate all athletic fields



MERIDIAN
SCHOOL
DISTRICT
learning tarkies here

Productive Summer Work

> Shift in custodial leadership and project management duties took place

> Rob Dunn has transitioned and has been instrumental in supporting the district’s work
> Custodial staff have been supportive and dedicated throughout the transition

> All of the work took place within a shortened work window

Questions?